15 yard roll-off

15 Yard Dumpster Rental in Johnson City, TN

16 ft long × 8 ft wide × 4 ft tall

A 15 yard dumpster holds about 4 to 5 pickup truck loads in a 16 by 8 foot footprint. It is the sweet spot for garage cleanouts, basement clearing, and flooring tear-out. high volume, moderate weight.

  • Guidance for 10 to 30 yard containers
  • Sizing help before you book
  • Local placement and permit guidance
Free quote

Get a fast, local quote

Tell us what you're clearing out. You'll get the container size, the included weight, the rental window, and the total. all before you commit to anything.

15 yard roll-off specifications
SpecificationDetail
Dimensions16 ft long × 8 ft wide × 4 ft tall
Capacity15 cubic yards (about 4–5 pickup truck loads)
Included weight2 tons
OverageAsk before booking per ton above the included allowance
Driveway footprint16 ft × 8 ft
Best forgarage and basement cleanouts, flooring tear-out, and small deck removal

What fits in a 15 yard dumpster

About 4 to 5 pickup truck loads. That covers a two-car garage cleanout, a full basement, roughly 1,500 square feet of carpet and pad, a mid-size deck removal, or a large yard clearing project.

The extra 6 inches of height over a 10 yard adds real capacity without making the walls hard to load over. For most homeowners doing a decluttering project, this is the container that gets the job done in one pull.

When to size up instead

If you are clearing an entire house rather than one level of it, or the garage has been accumulating for twenty years, go to a 20 yard. Sizing up one step costs far less than a second delivery.

Space you need

About 60 feet of straight approach, 10.5 feet of width, and 22 feet of overhead clearance. The 16 foot box fits a standard two-car driveway with room to walk around it.

Other sizes

Not sure this is the one? Compare against the 10 yard, 20 yard, 30 yard, or see the full size guide.

Straight answers

Frequently asked questions

How much does a 15 yard dumpster cost in Johnson City?

Quoted per project. The 15 yard is a volume-driven rental. garage and basement debris is bulky and light, so most loads stay inside the weight allowance and the price is driven by size and rental window rather than tonnage. The six variables behind every quote.

Is a 15 yard dumpster big enough for a garage cleanout?

For most two-car garages, yes. Garage debris is bulky but light, so you will hit the volume limit before the weight limit. Break down shelving and boxes as you load and a 15 yard handles it.

What is the difference between a 15 and a 20 yard?

The 20 yard is 6 feet longer and 6 inches taller, holds about 2 more pickup loads, and includes roughly a ton more disposal weight. For roofing and kitchen remodels, take the 20. For garage and basement cleanouts, the 15 is usually enough.

Keep reading

Related pages

Dumpster rental cost

Full pricing, tonnage allowances, and the fees to ask about.

What can go in a dumpster

Accepted and prohibited materials, including Tennessee-specific rules.

Do I need a permit?

When private-property placement is fine and when it is not.

Ready to clear the way?

Tell us about the project and we'll size it, price it, and get it scheduled. Serving Johnson City and the surrounding Tri-Cities communities.

Call for a free quoteGet a free quote